The 27th span of the Padma Multipurpose Bridge was installed at Zazira point in Shariatpur today, making 4.05 km out of the total 6.15 km bridge visible. “The 27th span of the bridge was installed on the pillar number 27…
The 27th span of the Padma Multipurpose Bridge was installed at Zazira point in Shariatpur today, making 4.05 km out of the total 6.15 km bridge visible. “The 27th span of the bridge was installed on the pillar number 27…