Power Development Board (PDB) is in dilemma over selling dry fly ash of Barapukiria unit-3 coal-fired power plant as the lone bidder proposed to buy it at Tk 550 per tonne.
Power Development Board (PDB) is in dilemma over selling dry fly ash of Barapukiria unit-3 coal-fired power plant as the lone bidder proposed to buy it at Tk 550 per tonne.